Mosmoxmosmox

Mosmox journal

In focus — product strategy.

A selection of publications grouped under the product strategy tag.

When a Business Needs an App—and When a Mobile Website Is Enough

When a Business Needs an App—and When a Mobile Website Is Enough

A mobile app is not automatically better than a responsive website. The right choice depends on how often people use the service, whether it needs system features, how users are acquired and what it costs to maintain over several years — not just on the budget for the first version.

People regularly come to us asking for “an app”, and in a fair share of cases the honest answer is different: first validate demand with a high-quality mobile web experience, and build the app once you have an audience that keeps coming back. Below are the criteria we use to make this decision with clients, a comparison table and typical mistakes on both sides.

When a website is enough

A website works well for first contact, search, content, one-off services and scenarios where users don’t want to install anything. It opens from a link in search results, a messenger or an ad, is indexed by search engines and updates without going through store review. For validating demand it is often the fastest and cheapest start.

  • Users come rarely: once a month, a quarter or a year.
  • The main acquisition channel is search and links, not the app store.
  • The scenario doesn’t need the camera, Bluetooth, background location or offline mode.
  • The product is still finding its model and changes need to ship daily.

When an app is justified

  • Users return regularly and benefit from launching quickly from the home screen.
  • You need push notifications, the camera, background location, Bluetooth, NFC or offline mode.
  • There is personal state that is convenient to keep on the device: history, drafts, downloaded content.
  • You need system integration: widgets, Apple Pay or Google Pay, biometrics, Health, the calendar.
  • High interaction frequency justifies the install and the cost of maintaining two platforms.

In practice the choice is rarely either-or. Most often we design a combination: the website stays the entry point from search and ads, while the app serves people who return. Universal Links on iOS and App Links on Android open the same content in the app if it is installed and on the website if it is not. Users keep their context, and the team doesn’t end up building two separate products with different logic.

Comparing the options

Between “website” and “native app” there is a middle option — a progressive web app (PWA): a site that can be added to the home screen, with caching and partial offline support. Its capabilities depend heavily on the platform, especially on iOS.

CriterionMobile webPWANative or cross-platform app
Access for a new userA single linkA link, then adding to the home screenInstall from the store
Search visibilityFullFullVia the store page and deep links
Push notificationsLimitedOn iOS from version 16.4, and only after adding to the home screenFull support
Bluetooth, NFC, background tasksMinimal, especially in SafariLimitedFull access to platform APIs
OfflineNone or minimalCaching via a service workerFull control over local data
Shipping changesInstantInstantThrough store review and user updates
Fee on digital purchasesNo store feeNo store feeTypically 15–30% depending on revenue, product type and region

Store fees change: Apple runs the Small Business Program with a 15% rate for developers earning up to $1 million a year, and Google Play has separate rates for subscriptions and regional programmes. Physical goods and services consumed outside the app usually do not require store in-app purchases. Check the current terms for your markets before modelling revenue.

Total cost, not just the first version

Don’t compare only the cost of initial development. In our experience, annual app maintenance takes a noticeable share of the original budget — this is a studio estimate that varies a lot by product. It includes:

  • updates for new iOS and Android versions and Google Play target API level requirements;
  • releases through the stores, App Review, privacy disclosures;
  • analytics, crash monitoring, security and dependency updates;
  • supporting older app versions that users haven’t updated;
  • the annual Apple Developer Program fee and one-time Google Play registration.

Sometimes a progressive web app or a high-quality mobile web experience delivers a better result than a rushed native release built “because competitors have one”.

Making the decision: step by step

  1. Describe the key scenario in one sentence and determine its natural frequency: daily, weekly, once a season.
  2. List the device capabilities you need and check which are available on the web on iOS and Android.
  3. Identify the acquisition channel: search and ads lead to a website, the app store leads to a product page.
  4. Calculate the total cost over 2–3 years, not just the first version.
  5. Validate demand the cheapest way: mobile web or an MVP with a minimal feature set.
  6. Set a threshold for moving to an app: for example, the share of users returning weekly, or demand for features the web cannot offer.

Common mistakes

  • Building an app for a scenario used once a year.
  • Wrapping a website in a WebView and calling it an app — App Review (guideline 4.2 on minimum functionality) may reject a product that offers no value beyond the website.
  • Launching an app without an acquisition plan: installs don’t appear on their own.
  • Neglecting the mobile site after the app launches, even though most new users still arrive through web search first.
  • Measuring success by downloads instead of behaviour after install — more in “Downloads are not the main metric”.

Decision checklist

  • The scenario is used at least weekly.
  • There are features the web cannot offer or cannot offer reliably.
  • There is a plan for driving installs and bringing users back.
  • The budget covers maintenance for at least two years.
  • The mobile site remains a high-quality entry point.
  • You have defined the metrics by which the decision will be reviewed in 3–6 months.

Make the decision after describing the key scenario and checking its frequency. If a user comes once a quarter, an icon on the home screen creates no value. If they open the service every day, a fast and personal experience can justify an app. Android’s quality guidance is a reminder that an app has to be intuitive, consistent and useful — otherwise it loses to the very same website.

Sources: Android Developers: App quality and user experience; WebKit: Web Push for Web Apps on iOS and iPadOS; web.dev: Progressive Web Apps; Apple: App Store Small Business Program; Play Console Help: Service fees.

How to Choose the Right KPIs for a Mobile Product

How to Choose the Right KPIs for a Mobile Product

A mobile product can have hundreds of metrics, but a team cannot manage all of them equally well. The right KPIs connect a business goal to observable user behavior and show where a problem actually occurs. The wrong ones create a feeling of control while the product slowly loses its audience.

In this article we share the metric structure we set up in projects before the first release: from the primary metric to diagnostic indicators and the rules that keep numbers from turning into noise.

Start with the outcome

Define the result the product creates: a completed order, regular learning, a paid subscription, or a resolved request. Then describe the events that lead there. An install is the beginning of a journey, not proof of value.

A simple test for a primary metric candidate: if it goes up, are users necessarily better off and the business better served? Session count fails the test: it can be inflated with pushy notifications. Completed orders per active user passes.

A basic metric system

  • Activation: does a new user reach the first useful action?
  • Retention: do they return after a day, week, and month?
  • Conversion: do they complete the business outcome?
  • Quality: can they do it without errors, freezes, or support?

For the UX side, the HEART framework described by Google researchers in “Measuring the User Experience on a Large Scale” is handy: Happiness, Engagement, Adoption, Retention, Task success. For each dimension, the authors recommend the Goals → Signals → Metrics chain: first the goal, then the behavioral signal, and only then the specific metric.

LevelExample for a delivery appHow often to review
Primary metric for the periodUsers with 2+ orders in 30 daysWeekly
ActivationShare of new users placing a first order within 7 daysWeekly, by cohort
RetentionD1, D7, D30 return after the first orderWeekly, by cohort
ConversionMenu → cart → payment → successful orderDaily after releases
QualityCrash rate, ANR, payment errors, contacts per 1,000 ordersDaily

What App Store Connect gives you, and its limits

App Store Connect Analytics follows the path from discovery to download, engagement, and purchases. The same logic works outside the App Store: a team should see the whole chain, not one final number.

The exact definitions matter. According to Apple’s metric definitions, an impression counts when the app is viewed in the App Store for more than one second; conversion rate is downloads and pre-orders divided by unique device impressions; a session is app use of at least two seconds. Usage data comes only from users who opted in to share analytics and appears when there are at least five active devices in the period.

The conclusion: store data describes the top of the funnel well, but activation and retention inside the product require your own product analytics with events you define yourself.

How to build a KPI system, step by step

  1. State the product outcome in one sentence and choose a primary metric that reflects it.
  2. Break the path to the outcome into 4–7 steps and define an analytics event for each.
  3. Write an event specification: name, when it fires, parameters, platforms. Without it, iOS and Android will count “the same thing” differently.
  4. Define diagnostic metrics for every funnel step and quality guardrail metrics.
  5. Establish a baseline from the first 2–4 weeks of data before setting targets.
  6. Set a target and an owner: who is responsible for the metric and what the team will do if it falls.
  7. Review the system quarterly, but never change definitions mid-experiment.

We covered how these indicators turn into a payback estimate in how to tell whether a mobile app pays off. To decide which problem the product should solve — and therefore what to measure — see our article on the core user problem.

Primary and diagnostic metrics

Keep one primary metric for a period and several diagnostic metrics. When the primary metric falls, diagnostics can show whether the cause is acquisition, onboarding, performance, or the offer.

It helps to distinguish leading and lagging indicators. D30 retention and revenue per user are lagging: honest, but they respond weeks later. The share of users who complete the first key journey in their first session is a leading indicator: it moves right after a release. In our projects we look for an event that is statistically linked to long-term retention and use it as a weekly guide, periodically checking that the link still holds.

For quality, use external benchmarks where they exist. For example, Google Play may reduce an app’s visibility if its user-perceived crash rate exceeds 1.09% or its ANR rate exceeds 0.47% (Android vitals thresholds). Such thresholds work well as guardrails: no product experiment counts as a success if it breaks them.

Common mistakes

  • Vanity metrics: downloads, sign-ups, total sessions with no link to the outcome.
  • Too many KPIs: if a team has ten “primary” metrics, it has none.
  • Averages instead of cohorts: an influx of new users hides falling retention among existing ones.
  • Different definitions across platforms: “active user” is counted differently on iOS and Android.
  • Changing definitions mid-experiment — comparisons lose meaning.
  • A metric with no owner and no action: everyone sees the number, but nobody knows what to do when it drops.

KPI system checklist

  1. The product outcome is stated in one sentence.
  2. There is one primary metric for the period that passes the “up means better” test.
  3. The path to the outcome is broken into steps with events.
  4. The event specification is the same for iOS and Android.
  5. Activation and retention are calculated by cohort.
  6. Quality guardrail metrics with thresholds are defined.
  7. Every metric has an owner and an action plan for a decline.

A good KPI system does not create more reports. It shortens the path from signal to decision and gives the team a shared definition of “the product is working.”

Sources:Apple: App Store Connect Analytics; Apple: App Store Connect metrics definitions; Google Research: Measuring the User Experience on a Large Scale (HEART); Android Developers: Android vitals.

How to Identify the Core User Problem an App Should Solve

How to Identify the Core User Problem an App Should Solve

Teams often begin with “which features should we add?” Strong mobile products begin elsewhere: what specific problem is a person trying to solve, how often does it occur, and what happens if it remains unsolved? The answer shapes everything else — from the list of screens to the copy in the app store.

In our projects, the problem statement is the first artifact of discovery, and we do not move to design until every stakeholder has agreed on it. Below we explain how to get one and how to test it.

The problem must be observable

“Users need a more convenient app” is too general. A better description is a situation: someone spends 20 minutes re-entering data, cannot check an order status, or loses context after an interruption. That can be tested through interviews, analytics, and prototype research.

A sign of a well-framed problem is that it can be observed or measured without your product. If the problem exists only in the team’s deck, and in real life people neither notice it nor do anything about it, it is most likely not important enough.

Weak framingStrong framingHow to test
“Ordering delivery is inconvenient”“Office workers spend 10–15 minutes coordinating a group order in a chat”Interviews, screenshots of real chats
“Customers want better expense tracking”“Freelancers manually copy bank statements into a spreadsheet for tax reporting at the end of each quarter”Observing the process, timing it
“Patients need easy booking”“Patients call the clinic three times to reschedule because the line is busy”Call-center data, missed-call counts

How to separate symptoms from causes

  • Ask what users do without your product.
  • Find the exact point of delay or error.
  • Compare what people say with what they do.
  • Check whether the problem is important enough to change a habit.

A useful technique is the “five whys.” A user complains the app is “slow.” Why? Because the order list takes long to open. Why? Because it loads the entire history. Why does that matter? Because the person opens the list only to check the latest order. The real problem is not list performance but the absence of the latest order status on the home screen.

Another framework is Jobs to be Done, described by Clayton Christensen and co-authors in “Know Your Customers’ Jobs to Be Done” in Harvard Business Review: people “hire” a product to get a job done in specific circumstances. Asking “what job is our app hired to do?” often removes half of the unnecessary features.

In practice we combine both techniques with data. If the product already exists, we look at which funnel step loses the most people, then run 5–6 short interviews specifically with those who stopped at that step. Numbers show where the problem is; conversations show why it happens.

The Headspace case: a problem broader than a feature

The Headspace case on Android Developers shows that a problem can be broader than a single feature. In 2019, the company decided to expand its meditation app into fitness and wellness. Designers prepared prototypes of the new experience, but the existing Android architecture was not structured clearly enough to support the new capabilities.

The team estimated that building on the old code would take longer than a complete rewrite, so it froze development of the current version and focused on the rebuild: MVVM architecture, Android Jetpack libraries, Dagger and Hilt for dependency injection, and a full move to Kotlin. Test coverage rose from about 15% to 80%. The rewrite took eight months.

The results reported in the case: the Google Play rating rose from 3.56 to 4.7 between Q2 and Q4 2020, monthly active users grew 15% globally, and paid subscriber parity between platforms improved by 20%. The technical side is covered in a separate Android Developers Blog post.

The takeaway for problem framing: the real problem was not “missing fitness screens” but “the product cannot reliably deliver a new promise.” Had the team framed the task as adding features, it would have kept building on a foundation that could not carry the load.

From problem to hypothesis, step by step

  1. Collect raw data: 8–12 interviews, support tickets, store reviews, analytics from the existing product or competitors.
  2. Write out concrete cases as “who — what they were doing — where they got stuck — how it ended.”
  3. Group the cases by shared barrier and count how often each appears.
  4. Score each barrier by frequency, severity of consequences, and existing workarounds.
  5. Write the hypothesis: “For [audience] in [context], we will reduce [barrier] so people can achieve [outcome].”
  6. Define the success signal and a minimum experiment that tests it.

We described how to run such an experiment before development in how to validate a mobile app idea, and how to turn a validated problem into a first release in our article on a mobile app MVP.

Common mistakes

  • Framing the problem as a solution: “users lack a chatbot” is a solution, not a problem.
  • Picking the loudest complaint instead of the most frequent and costly one.
  • Mixing several audiences in one statement: a business owner’s problem and their customer’s problem are different problems.
  • Ignoring the technical cause, as in the Headspace case: sometimes the barrier to new value is architecture, not the interface.
  • Never revisiting the statement after new data. The problem is a hypothesis, not dogma.

Problem statement checklist

  1. The problem is described as a situation with a concrete context and consequence.
  2. It can be observed or measured without your product.
  3. You know how people solve it today and what that costs.
  4. Symptoms are separated from the root cause.
  5. There is a hypothesis in the “for — in context — reduce — so that” format.
  6. A minimum experiment and success signal are defined.
  7. Product, design, engineering, and marketing have agreed on the statement.

A clear problem disciplines decisions, helps remove unnecessary features, and makes marketing more concrete. It is the foundation of UX and of the whole product strategy.

Sources:Android Developers: Headspace Android reboot; Android Developers Blog: Investing in app excellence — Headspace; Harvard Business Review: Know Your Customers’ Jobs to Be Done.

How to Validate a Mobile App Idea Before Development Begins

How to Validate a Mobile App Idea Before Development Begins

The most expensive mobile product mistake is not a technical bug. It is spending months building a feature that does not solve an important problem. Validating an idea before writing code helps separate real demand from a team’s assumption, and it costs a fraction of reworking a finished app.

This article describes the process we go through with clients during discovery: from framing the problem to a minimum experiment with a success criterion defined in advance. It does not guarantee success, but it shows honestly where the development budget should go.

Start with a problem, not features

Describe the problem in one sentence: who has it, when it appears, and how people solve it today. For example: “Owners of small coffee shops manually compile weekly supplier orders in a messenger and regularly get quantities wrong.” That sentence can be tested; “people need a convenient business app” cannot.

Then speak with people from the audience and ask about the last real instance, not a hypothetical “would you use this?” Behavior is usually more reliable than intent: almost everyone will agree an idea is interesting, but only some will remember the last time they faced the problem and how much time or money it cost. Rob Fitzpatrick describes this approach in detail in The Mom Test.

What to validate: four dimensions

DimensionInterview questionStrong signalWeak signal
Frequency and impact“When did this last happen? What happened next?”Weekly, with concrete loss of time or money“Sometimes,” with no example
Current alternatives“How do you solve it now? What does it cost?”Spreadsheets, manual work, paid workarounds“I don’t, but it would be nice”
Moment of habit change“What would have to happen for you to try something new?”A specific event or triggerGeneral agreement with no conditions
User language“How would you describe this to a colleague?”Repeated words across respondentsTerms the team invented

In our experience, 8–12 interviews with one clearly defined group are usually enough for answers to start repeating. If the picture is still chaotic after 12 conversations, the segment is most often defined too broadly.

A few practical interview rules: 30–45 minutes, one interviewer and one note-taker, recording only with the respondent’s consent. Recruit where the audience already discusses the problem: professional communities, topic chats, customers of an adjacent service. Right after each conversation, write down three quotes and one concrete case — a day later the details fade and your notes will contain only your interpretations.

What the YouTube Go story teaches

The YouTube Go story, written up by Google Design, shows why field research matters. The work began in 2014 with interviews in India, later expanded to Indonesia and Nigeria, and lasted about two years.

The team did not assume users simply wanted “lighter video.” An early concept with low-quality video — key frames with audio — was rejected by participants: they wanted a decent picture even with limited data. Instead, the real problem turned out to be opaque costs: people could unknowingly burn through a 100 MB data pack in one sitting. So the app showed a preview of key frames and the file size before streaming or downloading — for example 2, 5, or 12 MB depending on quality.

The key lesson: the right problem (“I don’t know how much data I will use”) was different from the obvious assumption (“I need worse but lighter video”). That kind of discovery is exactly what pre-development validation is for.

A minimum experiment, step by step

Before building an app, you can test a one-page description, a prototype of the core journey, a manually delivered service, or a waitlist. Here is the sequence we recommend:

  1. Write the hypothesis. “If [audience] gets [solution], they will [action], because [reason].”
  2. Define the success criterion before starting. For example: at least 40 waitlist sign-ups from the target segment in two weeks, or 7 of 10 prototype test participants completing the core journey without hints.
  3. Choose the cheapest format that answers this specific hypothesis (see the table below).
  4. Run it and do not change conditions mid-test, or the result becomes impossible to interpret.
  5. Record the decision: continue, change the hypothesis, or stop. No decision is the worst outcome.
FormatWhat it testsTypical timeline (studio experience)
Landing page + waitlistInterest in the promise and the language of value1–2 weeks
Clickable Figma prototypeClarity of the core journey1–2 weeks, 5–8 test sessions
Concierge / manual serviceWhether people actually use the outcome and come back2–4 weeks
Design sprintA fast team decision on a contested question, tested with users5 days

The design sprint format, in which a team moves from a problem to a tested prototype in five days, was described by Google Ventures in The Design Sprint.

Common validation mistakes

  • Asking about the future. “Would you download an app like this?” almost always yields an optimistic, useless answer.
  • Talking to friends and colleagues. They want to be supportive, not to give an honest signal.
  • Presenting the solution in the first half of the interview. After a demo, people discuss your idea rather than their problem.
  • Not defining the success criterion in advance. Then any result can be read as “broadly positive.”
  • Counting likes and views instead of actions that cost people time, contact details, or money.
  • Testing everything at once. One experiment, one hypothesis.

Checklist before development starts

  1. The problem is stated in one sentence and confirmed by real instances.
  2. At least 8 interviews were held with one clearly defined group.
  3. Current alternatives and their cost to the user are known.
  4. The words the audience uses for the need are collected and used in the prototype.
  5. A minimum experiment was run against a predefined criterion.
  6. There is a written decision: what we build first and why.
  7. There is a first estimate of how the product will pay off — see our article on whether a mobile app pays off.

A strong validation does not guarantee success. It reduces uncertainty and shows which problem deserves attention first. That saves team time and makes the eventual MVP much more precise. For the wider market context, see our overview of the key mobile market numbers for 2025.

Sources:Google Design: Making YouTube Go; Rob Fitzpatrick: The Mom Test; GV: The Design Sprint.

Mobile Shopping Apps: Why Global Competition Is Moving to the Smartphone

Mobile Shopping Apps: Why Global Competition Is Moving to the Smartphone

A mobile shopping app has long stopped being a digital copy of a catalog. It connects discovery, recommendations, payment, delivery and post-purchase communication. That is why competition between retail platforms increasingly happens at the level of everyday experience rather than price alone — and a local shop now competes not with the store next door but with global marketplaces shipping goods from another continent.

Below we look at what Sensor Tower’s data shows about the retail app market and share the approach we use when we design mobile commerce: from the first purchase to resolving a problem after payment.

What the market shows

According to Sensor Tower’s 2025 State of Mobile: Retail report, retail apps worldwide generated 6.6 billion downloads in 2024, and users spent 41.9 billion hours in them. Both metrics grew for the fourth year in a row. General marketplaces such as Amazon and Temu dominate the category, followed by apparel, coupons and grocery.

At the same time, the market is uneven. The US share of global retail app downloads was 11.9% and has been declining since 2021, while within the US, downloads fell 9.6% in 2024 and time spent dropped 4.5%. Growth is shifting to other markets, and Chinese e-commerce platforms such as Temu and SHEIN have turned cross-border shopping into an everyday mobile habit.

For businesses this means something simple: mobile has become a permanent touchpoint between brand and shopper, and expectations of speed, convenience and transparency are being set by the strongest global players.

What users expect

  • Find the product quickly — typo-tolerant search, filters and sorting without complex navigation.
  • See truthful information — current price, availability, delivery time and cost before checkout.
  • Not start over — a saved cart, favourites and the ability to continue on another device.
  • Pay in a few taps — Apple Pay, Google Pay, a saved address.
  • Stay in control after payment — status, push notifications, simple returns.

Baymard Institute data shows clearly where these expectations break. The average documented cart abandonment rate is about 70%, and the reasons shoppers give most often are unexpected extra costs (40%), slow delivery (20%), distrust of the site with card details (19%), mandatory account creation (18%), a complicated checkout (17%) and an unsatisfactory returns policy (13%).

The gap between promise and delivery

The weakest point in many retail apps is the gap between what the interface promises and the operational experience. A polished catalog cannot compensate for incorrect stock, an unexpected fee or a difficult return. In our projects we see that the mistakes most damaging to trust arise not in design but where the app meets the inventory system, the warehouse and the delivery service.

Product metrics should therefore cover the whole cycle, not only checkout conversion:

JourneyKey metricsTypical cause of loss
First purchaseView-to-cart and cart-to-payment conversion, time to paymentMandatory registration, hidden costs
Repeat orderShare of repeat buyers at 30 and 90 days, interval between ordersNo history, “order again” or saved details
Post-payment problemCancellations, support contacts, time to resolution, return rateIncorrect stock, opaque status, difficult returns

We explained how to combine these metrics into a payback model in our article on mobile app ROI metrics.

A step-by-step approach

  1. Describe three journeys: first purchase, repeat order and resolving a problem after payment.
  2. Walk through each yourself on a budget phone and a slow network, recording steps, errors and time to outcome.
  3. Show the full cost as early as possible: delivery, fees and the free-delivery threshold already in the cart.
  4. Remove mandatory registration from the first purchase and offer an account after payment.
  5. Sync stock and prices with the inventory system when the cart opens and before payment.
  6. Make the order status self-explanatory: users should get answers without calling support.
  7. Simplify returns: start them in the app, with clear deadlines and refund tracking.

After each step, cut everything that does not help the user decide or complete the transaction. We walked through a practical example of this approach for a niche store in our article on a mobile coffee bean shop.

How local businesses can compete with global players

Global marketplaces win on assortment and price, but a local service has advantages that are hard to copy: fast delivery, knowledge of local payment methods and carriers, support in the customer’s language, clear warranties and in-country returns. The mobile app should make these advantages visible — showing the real delivery time, local pick-up points, payment options and support contacts.

Another advantage is accuracy. A local store can guarantee truthful stock and predictable delivery, while a cross-border order often means weeks of waiting. If the app honestly keeps that promise, customers come back.

Technical quality should not be underestimated either. Fast startup, crash-free stability on budget devices and a catalog that works on a slow network are things shoppers feel every time they open the app. Global platforms invest enormous resources here, so a local store does not need to beat them on the number of features, but it should not fall behind on the speed and reliability of the core journeys.

Common mistakes and a checklist

  • Showing the delivery cost only on the last step.
  • Requiring registration before the first purchase.
  • Selling products that are no longer in stock.
  • Sending promotional push notifications instead of useful status updates.
  • Hiding returns in the support menu or requiring a phone call.

Checklist: full cost visible in the cart; guest checkout; Apple Pay and Google Pay; stock sync before payment; order status in the app and via push; returns in a few taps; cancellation, support and repeat-purchase metrics next to conversion.

Mobile commerce grows where an app makes a purchase predictable. Global competition only strengthens this requirement: a local service can beat an international player when it understands context better and keeps its promise more reliably.

Sources: Sensor Tower: 2025 State of Mobile: Retail; Baymard Institute: Cart Abandonment Rate Statistics; Apple Pay for developers; Google Pay API.

4.7 Billion Mobile Internet Users: Where the Opportunities Remain

4.7 Billion Mobile Internet Users: Where the Opportunities Remain

The global mobile market already has billions of users, but that does not mean everyone receives the same quality of digital experience. The next wave of products will compete not only on features but also on accessibility, clarity and trust — and that is where the opportunities lie that big players often miss.

Below we look at the latest GSMA data on mobile internet and share the practices we use to make apps work not only in lab conditions but also on affordable devices, slow networks and for people with different levels of digital skills.

The scale of the audience and the gap

According to the GSMA State of Mobile Internet Connectivity 2025 report, published in September 2025, the picture looks like this:

MetricValue
People using mobile internet on their own device4.7 billion, 58% of the world’s population
Population covered by mobile internet96%
Covered but not using it (usage gap)3.1 billion people, 38% of the population
Not covered (coverage gap)About 300 million people, 4% of the population
Cost of an entry-level smartphone16% of average monthly income, 48% for the poorest 20%

The key conclusion: the problem is no longer the networks. Almost everyone lives within coverage, yet billions do not use mobile internet. GSMA names the main barriers: awareness, device affordability, digital skills, as well as safety concerns and unreliable access to electricity. By the organisation’s estimate, a $30 smartphone could make handsets affordable to up to 1.6 billion people.

These numbers are not only about distant markets. Even in countries with near-universal coverage there are large groups of users with older phones, limited data plans or low digital confidence: older people, residents of small towns, people who buy second-hand devices. In Ukraine, power outages add to this, when networks become unreliable and people save battery. A product built only for a new flagship and stable 5G loses part of its audience without even noticing it in analytics.

What this means for a product team

Some of these barriers — device prices or coverage — are beyond developers’ control. But many others depend directly on how we design products. This is how we map barriers to decisions:

BarrierHow it shows up in the appProduct response
Expensive dataUsers skip updates and avoid mediaSmall build size, compression, caching, data-saving mode
Low-end deviceSlow start, crashes from low memoryTesting on budget models, memory control
Limited digital skillsUsers get lost in navigation and abandon sign-upPlain wording, minimal steps, hints
Distrust and safetyRefusal to enter data or payTransparent terms, minimal permissions, clear privacy
Unstable network and powerInterrupted operations, lost dataOffline mode, action queue, state saving

Technical practices for affordable devices and networks

  • Support older OS versions as far as audience analytics justifies: every version you drop is people who cannot install the product.
  • Watch build size. Android App Bundle, Play Feature Delivery and App Thinning on iOS let you ship only the resources a device needs.
  • Control memory. Android vitals already lists memory usage among its core vitals, and Google has announced an impact on Play visibility from February 2027. On devices with 4 GB of RAM the threshold for a foreground app is 2 GB.
  • Do not require a fast connection for the core action. Browsing a catalog, filling in a form or reading saved content should work on a slow network.
  • Design offline as a normal state, not an error: cached content, an action queue and sync once the network returns.

Google summarises these principles in its Build for Billions guidelines, and we wrote more about saving data in our article on 22 GB per smartphone.

Language, trust and localization

Accessibility is not only about technical parameters. Use clear language and do not hide important conditions behind technical terms. Localize not just interface strings but also examples, currencies, date and number formats, payment methods and addresses. In some markets, payment without a bank card — mobile money or cash on delivery — is essential.

Trust is built through minimal permissions, an explanation of why each one is needed and transparent pricing without hidden fees. Follow WCAG: sufficient contrast, text scaling, VoiceOver and TalkBack support — these requirements help people with disabilities, older users and anyone using a phone in bright sunlight.

Pay special attention to the first experience. For someone who has only recently got a smartphone, sign-up with an eight-character password, email confirmation and five permission requests can be an insurmountable wall. Phone-number login, asking for permissions gradually at the moment they are actually needed and letting people try the product without an account remove most of these barriers.

A step-by-step plan

  1. Analyse your audience: distribution by device model, RAM, OS version, network type and language.
  2. Choose a reference budget device and make it mandatory for testing every release.
  3. Set budgets for build size, startup time and data volume for key journeys.
  4. Review copy for clarity: short sentences, no jargon, with examples.
  5. Run an accessibility audit against WCAG and test with VoiceOver and TalkBack.
  6. Measure conversion by device type, network speed, language and payment method — that shows where barriers cut off your audience.

Common mistakes and a checklist

  • Testing only on developers’ flagship phones.
  • Raising the minimum OS version without analysing the audience you lose.
  • Asking for registration and permissions before people have seen any value.
  • Translating strings without adapting examples, currencies and formats.
  • Treating offline as an exception and showing an empty screen.

Checklist: a budget device in the test matrix; budgets for size, startup and data; an offline state for key journeys; clear copy; an accessibility audit; conversion analytics by device, network and language.

Accessibility is not a charitable add-on. It expands the market and reduces the number of journeys that start but never finish. A mobile product that works under real conditions across markets usually becomes more reliable for its primary audience too: simplicity, small payloads and a correct offline state are investments in both inclusion and quality.

Sources: GSMA: State of Mobile Internet Connectivity 2025; Android Developers: Build for Billions; Android Developers: Android vitals; W3C WAI: Mobile Accessibility; Apple: Localization.

AI in Mobile Apps: From Download Growth to Real User Value

AI in Mobile Apps: From Download Growth to Real User Value

In 2025, apps with generative artificial intelligence became one of the most visible areas of the mobile market. But rapid download growth alone does not prove long-term product value: there is a huge distance between “tried it out of curiosity” and “use it every week and pay for it”.

Here is how we approach AI features in mobile products: where we start, which checks every scenario must pass, which metrics we track and where teams most often go wrong.

What the market shows

According to Sensor Tower, downloads of generative AI apps grew 148% year over year in 2025. In the same year, global in-app purchase revenue reached $167 billion, and for the first time non-gaming apps overtook games on this metric — the report explicitly names generative AI services among the drivers. We covered the wider market picture in our article on $167 billion and 5.3 trillion hours of attention.

The number shows strong interest, but it does not answer the more important questions: did users complete a useful task, return the following week, understand what they were paying for — and does that payment cover the cost of model requests?

AI as a function, not decoration

The strongest scenario starts with a problem, not a model. Users may want to draft text faster, find information, translate a message, understand a document or make a decision. AI should shorten that path instead of adding another settings screen or an empty chat box the user does not know what to type into.

In our projects we define an AI feature through a concrete action: not “add an assistant” but “cut the time to write a product description from ten minutes to one” or “let users find the right clause in a long contract without scrolling”. That framing immediately sets a success criterion and suggests where the feature belongs in the interface — where the user already performs that action.

Apple’s Human Interface Guidelines for generative AI recommend that an app remain useful when generative features are unavailable or unused, and that people understand generated content may contain mistakes. Google’s PAIR Guidebook makes the same point: users’ expectations of what the system can do should be calibrated from the very first contact.

Four checks for every scenario

  1. Is the result clear? Users should see what they will get: examples, suggestions and previews instead of an empty field.
  2. Can the answer be verified? Facts and decisions need sources, warnings and a quick way to correct the result.
  3. What happens to the data? The product should explain what is processed, where and why, and should not send sensitive information to third-party models without consent.
  4. Is there a manual path? Important actions — payment, deletion, sending a message — should not depend on unpredictable generation without human confirmation.

Store requirements matter too. Google Play’s AI-generated content policy requires apps that generate content to offer an in-app way to report offensive output without leaving the app, and the App Store’s requirements for user-generated content (guideline 1.2) — filtering, reporting and blocking — are worth applying to generated content as well: reviewers judge what the user sees, regardless of who created it.

Metrics that show real value

Do not evaluate the feature by model request volume alone. This is the set we use:

MetricWhat it measuresWarning sign
Time to resultFrom starting the action to an accepted resultNo shorter than without AI
Accepted output rateResults used without substantial editsMost answers are rewritten or discarded
Repeat useShare of users who use the feature again within 7 daysOne-off curiosity trials
Support contactsComplaints about errors or confusing answersGrowth after the feature launches
Cost per useful outcomeInference spend / accepted resultsExceeds revenue per user

The last metric is often overlooked. Unlike an ordinary feature, every model request costs money, and the most active users can generate costs that exceed their subscription. Limits, caching of repeated answers and choosing a smaller model for simple tasks are therefore product decisions, not just engineering ones.

Mobile products have one more lever: on-device models. Apple has opened its Foundation Models framework to developers, and Google offers ML Kit GenAI APIs built on Gemini Nano. These models are smaller than cloud ones, but for short tasks such as summarising, rephrasing or classifying text they work offline, with no per-request cost and without sending data to a server. In our projects we often combine both approaches: simple tasks run locally, complex ones in the cloud.

Launching an AI feature step by step

  1. Pick one scenario with a clear benefit and a measurable “before” — how much time or how many steps it takes today.
  2. Collect 50–100 real examples of inputs and expected outputs for quality evaluation.
  3. Build a prototype and check quality on that set before designing the interface.
  4. Design the states: generating, result ready, error, model refusal, no network.
  5. Roll the feature out to part of the audience and compare metrics with a control group.
  6. Set up monitoring of quality, cost and complaints, and review the example set monthly.

Common mistakes

  • Adding a chat as a universal answer to every task.
  • Showing generated facts without sources or caveats.
  • Not calculating inference costs before setting prices.
  • Making the product unusable without AI when the model is unavailable.
  • Judging quality by eye without a fixed set of examples.

A pre-release checklist

  • The scenario is defined through a concrete action and a measurable benefit.
  • There is an example set for quality evaluation.
  • Users understand the result is generated and can correct it.
  • Data processing is explained and sensitive data is protected.
  • There is a way to report generated content.
  • Cost per useful outcome is calculated and limits are in place.
  • The product works if the AI feature is temporarily unavailable.

Market growth creates opportunity, but it does not replace product discipline. The winners will not be the loudest AI apps; they will be the products that reliably solve a specific user problem.

Sources: Sensor Tower: State of Mobile 2026, 2025 data; Apple Human Interface Guidelines: Generative AI; Google PAIR: People + AI Guidebook; Google Play Console Help: AI-Generated Content; Apple: App Review Guidelines.

How to Tell If Your Mobile App Pays Off

How to Tell If Your Mobile App Pays Off

A mobile app can have tens of thousands of installs and still fail to deliver the return a business expects. To understand whether a product pays off, one impressive number in a report is not enough: you need to follow the whole user journey — from the first open to repeat purchase and long-term use — and compare it with what each step costs.

In our projects we keep seeing the same picture: teams count installs because they are easy to find in App Store Connect or Google Play Console, but they rarely connect marketing spend, in-product behaviour and real revenue after fees in a single model. Below is the metrics system we use, with formulas, thresholds and common mistakes.

What “paying off” really means

Payback does not always mean instant profit after launch. For some products it means direct income from purchases or subscriptions. For others it means more repeat orders, lower service costs, more frequent visits or higher value from customers who previously bought only through the website or by phone. So the first step is to write down the business outcome and the evaluation horizon: “the app must recover its development and acquisition costs within 18 months” is a testable goal; “the app should be successful” is not.

Agree separately on which costs are included: development, maintenance and hosting, marketing, store fees, payment processing and customer support. App Store and Google Play fees range from 15% to 30% of digital purchase revenue depending on the programme and product type, so revenue “before fees” and “after fees” can differ by almost a third.

The funnel: from install to activation

Install volume shows how well reach, advertising and the store listing work, but an install alone creates no value. Track the acquisition source, first-launch rate, registration and cost per install (CPI). If people install the app but never reach a useful first action, the issue is usually positioning or onboarding rather than the ad budget.

The key early-funnel metric should be activation — the moment a person gets a first real result. For a delivery service it is the first order; for a finance product, a funded account; for a B2B tool, the first task created. Compare install-to-registration and registration-to-activation conversion separately: they are different problems with different fixes.

MetricHow to calculateWhat it tells you
CPIChannel spend / installs from that channelEffectiveness of ads and the store page
ActivationUsers with a first useful action / installsOnboarding quality and fit with the promise
Retention D1 / D7 / D30Share of a cohort returning on day 1, 7 and 30Habit strength and value of the repeat journey
Paid conversionPayers / activated usersFit between price and value
ARPPUNet revenue / payers in the periodDepth of monetization
CACAcquisition spend / new paying customersThe real price of a customer, not of an install
LTVAverage net contribution per customer over their lifetimeHow much you can afford to spend on acquisition

Retention: do users come back

Retention shows what share of people return after a day, a week or a month. Cohorts — groups of users who installed in the same week — help separate a temporary spike from a lasting habit. Look at the shape of the curve rather than the average: a healthy curve flattens into a plateau after the initial drop, while a curve that keeps sliding towards zero means there is no repeat value.

Compare cohorts by channel, segment and product version. If retention drops right after the first week, check whether the product gives people a reason to come back: a repeat scenario, useful reminders, saved state. If it collapses on day one, the problem is almost always the first session.

Repeat purchases, revenue and unit economics

For a commercial app, track repeat purchase rate, average order value, paid conversion and revenue per active user. Separate new and returning customers: a repeat purchase often reveals real value more clearly than a one-off transaction that a discount may have triggered.

CAC is the cost of acquiring one paying customer. LTV is the expected contribution from that customer over the whole relationship. The simplest subscription formula is LTV = monthly net revenue per customer × gross margin / monthly churn. A widely used rule of thumb is an LTV-to-CAC ratio of at least 3:1 and CAC payback within 12 months; it is a guideline rather than a law, and products with long sales cycles may need different targets.

A purely illustrative example: a subscription costs UAH 200 a month, UAH 140 remains after store fees and taxes, and monthly churn is 8%. LTV ≈ 140 / 0.08 = UAH 1,750. If acquiring a paying customer costs UAH 900, the ratio is about 1.9:1 and payback takes more than six months. It is too early to scale that channel: first reduce churn or acquisition cost.

A step-by-step measurement system

  1. Choose one primary metric tied to the business outcome and three or four supporting ones: for example activation, D30 retention, repeat purchase and net revenue per user.
  2. Write a tracking plan: event name, parameters, trigger and owner. Without it, analytics drifts apart across platforms within a few releases.
  3. Connect the data sources: product analytics, attribution that respects App Tracking Transparency and AdAttributionKit on iOS, payment data from store server notifications, and ad accounts.
  4. Build weekly install cohorts and always split them by channel.
  5. Set a review cadence: funnel and retention weekly; LTV, CAC and payback by channel monthly.
  6. Tie metrics to decisions: every product or budget change gets a hypothesis, an expected effect and a review date.

Common mistakes

  • Counting revenue before fees and refunds. Gross revenue inflates LTV by at least the store fee, and by more once taxes and refunds are included.
  • Dividing spend by installs instead of paying customers. A cheap CPI easily hides an expensive CAC.
  • Relying on averages. One efficient channel masks a loss-making one unless you split them.
  • Forecasting LTV from two weeks of data. Early cohorts always look better than they will in six months.
  • Changing event definitions without versioning. After such a “refactoring”, metric trends stop being comparable.

Checklist before you call it payback

  • The business outcome and evaluation horizon are written down.
  • Activation is defined as a specific event, not as “registration”.
  • Retention is measured by cohort and by channel.
  • Revenue is taken after store fees, taxes and refunds.
  • CAC is per paying customer; LTV is based on contribution margin.
  • LTV:CAC and payback are reviewed monthly for every channel.

You can see whether a mobile app pays off when marketing spend, user behaviour and revenue are connected in one clear model. Installs show scale, activation shows first value, retention shows habit strength, repeat purchases show the quality of the offer, and the LTV-to-CAC ratio shows the economics of growth.

Sources: Apple: App Analytics; Apple: App Store Small Business Program; Google Play Console Help: Service fees; Apple: AdAttributionKit; Google Analytics for Firebase.

Journal

Ideas and products