Mosmoxmosmox

Mosmox journal

In focus — mobile development.

A selection of publications grouped under the mobile development tag.

OTA Updates in Expo: Hotfixes from Your Phone and the Line You Should Not Cross

OTA Updates in Expo: Hotfixes from Your Phone and the Line You Should Not Cross

On November 26, 2026 Expo showed how to fix a bug and ship it to production with nothing but a phone. A developer describes the problem in a chat with an AI assistant, checks the fix on a cloud iPhone and sends it to users as an over-the-air (OTA) update, with no new build and no App Review. It sounds ideal for hotfixes. But OTA has hard technical limits, and the app stores have their own rules. Here is how the flow is built and where a quick hotfix ends.

The flow comes from the Expo blog, and the commands come from the EAS Update documentation.

How it worked in Expo's demo

The demo app is OpenMulticam, a camera app: two buttons in the top bar looked clipped when pressed and dragged. The author noticed it on a walk. Then:

  • In the ChatGPT mobile app he asked it to fix the buttons and verify the result in Expo Simulators. The chat app reaches the project through the Expo MCP connector, which exists for ChatGPT, Claude and Grok.
  • A few minutes later a pull request appeared with the style fix, a regression test and recordings of the same gesture on a cloud iPhone, before and after the fix.
  • The author reviewed the PR and merged it himself.
  • A first workflow published the update to a verify channel, and the author checked it again on a cloud iPhone.
  • Only then, on a separate request, a second workflow published the same update to the production channel that the App Store build listens to.

The Expo connector does not push code or open PRs itself. That is done by the chat app's own GitHub integration, such as Codex in ChatGPT, or by a fine-grained GitHub token scoped to that one repository.

Two workflows instead of one button

The key element is two separate manual workflows in .eas/workflows/. Both are of type update and only run on demand (workflow_dispatch):

  • verify-update.yml publishes the update to the verify channel, which a simulator build listens to;
  • publish-production.yml publishes the same update to the production channel.

Both builds in eas.json share one runtime version, so an update verified on verify is guaranteed to be compatible with the production build. Another detail from Expo's setup is the agent rules in AGENTS.md: make the fix on a branch, open a PR, wait for a human to merge, and publish to production only on an explicit request. For a team these rules matter more than the phone: the agent proposes, the human decides.

On pricing: Expo Update is available on every plan, including Free, while Expo Simulators requires a paid plan.

Limit one: what OTA can change at all

An OTA update changes only the JavaScript bundle and assets. Expo says so directly: changes to native dependencies, permissions or native configuration still require a new build and App Store review. According to the EAS Update docs:

  • you can: fix JS bugs, change copy and translations, styling and screen layouts;
  • you cannot: add or upgrade a native module, request a new permission (camera, location and so on), or upgrade the Expo SDK.

Compatibility is guaranteed by runtimeVersion. If an update was built against different native code, the app may crash and expo-updates will roll back to the previous working version. So choose the policy deliberately:

  • "policy": "appVersion" changes the runtime version together with the app version. It is simple, but if you change native code and forget to bump the version, you get a mismatch;
  • "policy": "fingerprint" changes the runtime version whenever anything that may affect the native runtime changes. For teams that update dependencies often, it is the safer option.

Limit two: store rules

App Store. Guideline 2.5.2 requires an app to be self-contained in its bundle and not to download or execute code that introduces or changes its features or functionality. The Review Guidelines have no rule specifically about OTA, and Expo does not promise that every update is fine. The EAS Update docs say you need to follow the platforms' rules, and that changes to your app's behavior usually need to be reviewed. The practical takeaway: OTA is a tool for fixes and small UI changes, not a way to ship a new feature around App Review.

Google Play. The Device and Network Abuse policy forbids an app from updating itself outside Google Play's update mechanism and from downloading executable code (dex, JAR, .so) from other sources. There is an exception for code that runs in a virtual machine or interpreter with indirect access to Android APIs, such as JavaScript. At the same time the policy says that code loaded at run time must not enable violations of other Google Play policies.

For a team this comes down to a simple rule: if a change deserves a line in "What's New", it should go through a new build and review.

How to keep a hotfix from becoming an incident

Publishing to production in minutes is both the benefit and the risk: a mistake also reaches every user in minutes. EAS Update has tools to contain that risk:

  • Gradual rollout. eas update --rollout-percentage=10 serves the update to 10% of users only. You change the percentage with eas update:edit, and eas update:revert-update-rollout cancels the rollout and restores the previous update. Only one active rollout is allowed per branch, platform and runtime version.
  • Rollback. eas update:rollback returns users to a previously published update or to the update embedded in the build. The latter helps when every OTA version is broken.
  • Monitoring. Expo recommends watching the error rate on the dashboard during a rollout and stopping it if errors rise.

The demo in Expo's blog publishes straight to 100% and does not mention rollback. For an app with a real audience we recommend adding a gradual rollout between verify and production.

OTA hotfix checklist

  • The change touches only JS or assets: no new native modules, permissions or SDK upgrades.
  • The change fixes or refines existing behavior rather than adding a new feature.
  • runtimeVersion uses the fingerprint policy or another one the team understands.
  • The fix went through a PR and human review, even if an agent wrote the code.
  • The update was first checked on a separate channel with the same runtime version.
  • In production: 5–10% of users first, then error monitoring, then 100%.
  • The team knows how to roll back: eas update:rollback or a return to the embedded update.
  • The agent may publish to production only on a direct human command.

Conclusion

Expo's demo shows that the whole hotfix cycle, from bug report to production, can be done from a phone in half an hour. The interesting part is not the phone but the structure: a separate verification channel, a shared runtime version, a PR with a test and a screen recording, and a human with the final say. Copy that structure into your own process, add a gradual rollout and a rollback plan, and OTA becomes a reliable way to fix bugs quickly. Just do not use it to ship new features around App Review.

Expo + Supabase for an MVP: A Backend in One Command and the RLS You Cannot Ship Without

Expo + Supabase for an MVP: A Backend in One Command and the RLS You Cannot Ship Without

On November 10, 2026 Expo added an EAS CLI command that connects Supabase to an Expo app in one step: it creates the project, installs the SDK and writes keys into every environment. For an MVP this means Postgres, authentication, file storage and realtime in a few minutes. But there is one thing you cannot ship such an app without: Row Level Security. Here is how the integration works and what to do before release.

The facts come from the Expo changelog.

What the command does

You need eas-cli 21.8.0 or newer and a project linked to Expo Services. The eas integrations:supabase:connect command:

  • opens the browser once to authorize Supabase, asks for an organization and region, and creates the project;
  • installs @supabase/supabase-js and expo-sqlite and adds the expo-sqlite config plugin;
  • writes EXPO_PUBLIC_SUPABASE_URL and EXPO_PUBLIC_SUPABASE_PUBLISHABLE_KEY to .env.local and to Expo environment variables for Production, Preview and Development.

Local development, builds and updates all read the same values. If you already have a Supabase project, connect it with --link. Rerunning is safe: the command reuses what it created and asks before replacing anything. In CI, after a one-time browser authorization, it runs without prompts using --non-interactive.

Who owns the project

The project is created in your own Supabase organization: the data and the bill are yours. Expo keeps an encrypted token so the CLI can act on your behalf; you can revoke it in Supabase or with eas integrations:supabase:disconnect. Expo generates a random database password, hands it to you and keeps no copy. If you later need psql or migrations, reset the password in the Supabase dashboard.

The key point: RLS

Both values the command writes are public: they are bundled into the app and anyone can extract them from a build. Expo states plainly that Row Level Security is what protects the data. Without RLS and policies, anyone with the publishable key can query your tables directly, bypassing the app.

What to do before the first release:

  • Enable RLS on every table the app reads or writes.
  • Write separate policies for select, insert, update and delete. The usual approach is access only to rows whose owner matches the current user's ID.
  • Test the policies with requests as another user and while signed out.
  • Never put Supabase secret keys with full access into the app: they belong only on the server or in edge functions.

A separate backend per environment

At first all three environments share one project. That is convenient for an MVP but risky: a test build writes to production data. Running eas integrations:supabase:connect --environment preview creates a separate project for Preview, so a preview build can never change production. We recommend doing this before the app gets its first real users.

Sessions and native modules

The client snippet in the docs stores the session in expo-sqlite, so users stay signed in between launches with no AsyncStorage and no custom adapter. Everything works in Expo Go. You need a development build once you pass options to the expo-sqlite plugin or add other native libraries.

Local development

The app reads .env.local, so switching to a local database is a two-line change. npx supabase init and npx supabase start bring up Postgres, auth and Studio on your machine without a Supabase account. Take the URL and key from supabase status, and create your tables in Studio at 127.0.0.1:54323, since the local database starts empty. Local work does not count against the two active projects on the Supabase Free plan.

MVP checklist for Expo + Supabase

  • eas-cli 21.8.0+, eas integrations:supabase:connect.
  • RLS enabled on all tables, policies tested as different users.
  • A separate Supabase project for Preview.
  • Database schema and policies kept as migrations in the repository, not only in the dashboard.
  • A local stack for development so experiments never touch cloud data.
  • Before release, check your Supabase plan and the Free plan limits.

Conclusion

The Expo and Supabase integration removes the manual backend and environment variable setup: from an empty project to the first database query takes minutes. It is a good start for an MVP. A fast start does not cancel security, though: a public key in the app is fine only when RLS and policies really restrict access. Set them up, together with a separate Preview environment, before real data arrives in the app.

Android Apps from Google AI Studio and Firebase: From Prototype to Google Play Release

Android Apps from Google AI Studio and Firebase: From Prototype to Google Play Release

On November 17, 2026 Firebase announced that Google AI Studio now generates full Kotlin Android apps with a backend: a database, Google sign-in and Gemini-powered AI features. You describe the idea in a prompt and the agent sets up the rest. For a founder this means a working prototype in an evening. But there is still a lot of work between "it works in the demo" and "it is ready for Google Play". Here is what the integration does and what to check before release.

Facts about the integration come from the Firebase blog post.

What the AI Studio agent does

When you ask for an Android app, the agent detects from your prompt whether you need AI features, data storage and user sign-in. With your approval it:

  • creates a Firebase project, provisions Firestore, enables Firebase Authentication and connects the app code to them;
  • configures Google Sign-In;
  • adds AI features through Firebase AI Logic (Gemini API calls) with App Check enforced automatically.

According to Firebase, you do not need to install anything, write code, configure libraries by hand or even enter a credit card.

What changed from the previous version

Before, Kotlin apps from AI Studio kept data only in the browser session: close the tab or switch devices and the data was gone, and collaborative features were impossible without a cloud database. Now data lives in Firestore protected by Firebase Security Rules, so a user can start on a tablet and continue on a phone. Firestore also works offline and syncs once the network is back. The agent writes and validates Security Rules together with the authentication setup.

Why App Check matters here

If an app calls Gemini directly, the key and quota are easy to steal. Firebase AI Logic keeps credentials on the server, and App Check verifies that requests come from your genuine app on an untampered device. Enabling it by default is the right call: an unprotected AI endpoint can burn through a budget in days.

Where the prototype ends

The generated app covers the technical start: project, database, sign-in, AI. A release depends on things the prompt does not know about. Here is the checklist we recommend before publishing.

1. Data security

  • Read the Security Rules like an attacker: can a user read or change someone else's documents if they know the ID?
  • Check that App Check is enforced for every service and that debug tokens are not in the release build.
  • Make sure there are no secrets in the code and that AI requests go only through AI Logic.

2. Money and limits

  • Starting without a card does not mean running for free. Before launch decide which plan Firestore and Gemini will run on, and set up budget alerts in Google Cloud.
  • Estimate the cost of one active user: how many Firestore reads and Gemini tokens a typical flow uses.
  • Add per-user rate limits for AI requests so one account cannot drain the quota.

3. Google Play requirements

  • A privacy policy and an accurate Data safety form: the app collects a Google account, stores data in Firestore and sends content to Gemini.
  • If users can create an account, Google Play requires a way to delete it, both in the app and through a web link.
  • Generative AI apps fall under separate Google Play rules on AI-generated content and letting users report it.

4. Code quality and maintenance

  • Generated code needs a review and an architecture the team can grow: separated UI, logic and data, error handling and offline states.
  • Add analytics, Crashlytics and at least basic tests for key flows.
  • Make sure the code is in your repository and the Firebase project is in your Google Cloud organization with more than one person having access.

5. Product

  • AI answers can be wrong: decide how the app shows uncertainty, lets users regenerate a result and what they see when Gemini is unavailable.
  • Check the first-run experience: Google sign-in, empty states, onboarding.

Who benefits

Founders can test an idea with real users before investing in development. Product managers can show the team a live prototype instead of a mockup. Developers get a fast scaffold with Firebase services already connected, which they then bring up to production quality.

Conclusion

AI Studio with Firebase removes the dullest stage: setting up the backend, sign-in and secure access to Gemini. It really does shorten the path from idea to prototype. A Google Play release, though, needs what a prompt cannot solve: verified access rules, cost control, policy compliance and maintainable code. Plan that stage from day one and the prototype becomes a product rather than a demo you will have to rewrite.

Expo Services: Mobile CI/CD from Your Phone for a Small Team

Expo Services: Mobile CI/CD from Your Phone for a Small Team

On November 18, 2026 Expo released the Expo Services app: Expo Workflows, Observe data and cloud simulators on your phone. For a small team it is a way to keep builds and releases under control without a laptop. Here is what it does and who it helps.

All facts come from the Expo changelog.

What the app is

A mobile client for Expo services so you can monitor and act on changes without opening expo.dev. It is available for iOS (iPhone and iPad) and for Android on Google Play. According to Expo, the iOS version is written entirely in Expo Exact.

What you can do

  • Observe: an overview screen with a TTI (time to interactive) chart, active users and recent activity. Chart points can be scrubbed. Projects without Observe are shown how to add it.
  • Workflows, Builds, Updates, Submissions: each has a list and a detail page. You can filter runs, start a workflow on a chosen branch with inputs, open jobs, logs and artifacts, install a build on your phone, cancel a build or re-run a workflow.
  • Notifications: in Settings you can turn on a push when a workflow run finishes; tapping it opens that run.
  • Expo Simulators: a cloud iOS or Android simulator started from a build that you can use live. You can set location and orientation and watch CPU, memory and network. After the session you keep screenshots, recordings, logs and a performance summary.
  • iPad and iPhone Duo: the app runs natively on iPad with a sidebar, and on iPhone Duo the sidebar follows the hinge.

Limitations

Simulators in the app are iOS-only for now: Android simulator support is "coming very soon," according to Expo. Native widgets, Live Activities and more Observe data are planned. The page does not state pricing, regions or whether the release is beta. Sign-in works with email and password, Google, GitHub, Apple, SSO or passkey.

Why it helps a small team

  • Fast reaction to failures. A push when a workflow finishes tells you about a broken build while you are away from your computer.
  • Releases without a laptop. Re-running a workflow or canceling a build takes a few taps.
  • Checking on a real device. Install a build from your phone and test it right away.
  • Metrics in your pocket. TTI and active users are visible without a separate dashboard.

What to consider

  • The app pays off if you already use Expo Workflows and Observe. Without them most features will not matter.
  • Managing releases from a phone needs access discipline: protect the account, for example with a passkey or SSO, and be clear about who may start workflows and submissions.
  • Do not rely on push alone: add a team chat channel too.

Conclusion

Expo Services does not replace a full CI dashboard, but it covers the common small-team situations: learning about a failure, re-running a build and checking the result on a phone or in a cloud simulator. Try it on one project before moving your release process to it.

App Store Group Subscriptions: Selling Seats to Teams and Families and What to Set Up Now

App Store Group Subscriptions: Selling Seats to Teams and Families and What to Set Up Now

Apple has added a new way to sell App Store subscriptions: multiple seats in one subscription. Organizations and schools can buy subscriptions in volume starting October 22, 2026, and Apple says "group purchases" for regular users arrive on the App Store this winter. Here is what changes for your app and what to check in App Store Connect.

The facts come from Apple Developer News and the App Store Connect help page on purchase options for auto-renewable subscriptions.

What multiseat purchasing is

A customer can buy a subscription in a quantity greater than one. The buyer becomes the "group purchaser," who manages the shared subscription and decides who gets access. An organization buys the seats it needs through a single In-App Purchase and assigns them with its existing device management tools. Seats can be added or removed at any time. Organizations and schools buy through Apple Business or Apple School Manager.

What about groups

The same App Store Connect feature supports subscriptions for groups. From November 2026 you can configure and test group purchases in a Sandbox Apple Account. This winter they become available on the App Store: a person buys several seats and invites others to use the subscription. The App Store Connect help page only says "later this year," with no exact date.

What to know about the settings

  • It is on by default for auto-renewable subscriptions. According to the help page, subscriptions created before September 14, 2026 are opted out if they do not use StoreKit 2 or do not have Family Sharing turned on.
  • Where to change it: your app, Monetization, Subscriptions, the subscription, Purchase Options. You need the Account Holder, Admin or App Manager role.
  • Two questions in the settings: whether customers can buy multiple seats (it must be "yes" for Apple Business and Apple School Manager) and where the subscription is sold: the App Store, Apple Business, Apple School Manager.
  • Turning multiseat off after approval is possible but not painless. New customers cannot buy multiple seats, existing subscriptions run until the group purchaser cancels, and no new seats can be added. App Store availability cannot be removed after approval.
  • Family Sharing: if it is on, you must confirm before enabling multiseat. Only the group purchaser can share with family, and other seats are for individual use. Once Family Sharing is on, it cannot be turned off.
  • License agreement: Apple updated the Developer Program License Agreement with terms for multi-seat subscriptions, and you need to accept it in your account.

Why it matters for your product

Until now a subscription was personal: one person, one subscription. Now the same subscription can be sold to teams, classrooms and families without building your own licensing and invoicing. For B2B apps it opens a sales channel through Apple Business. For consumer apps it is a way to sell a "pack of seats" and encourage users to invite others.

What to do now

  • Review Purchase Options on every subscription and decide on purpose whether you want to sell to organizations: it may already be enabled by default.
  • Check that your app handles a subscription used by several people, and that access distinguishes the payer from the user.
  • Test group purchases in Sandbox before they launch on the App Store.
  • Accept the updated license agreement.
  • Think through pricing: what to offer for multiple seats and whether volume discounts make sense.

Conclusion

Group purchases turn a subscription from personal into shared. If you earn from subscriptions, walk through the settings now: some changes apply by default and the rest launch this winter. The materials we read do not state pricing, commission or seat limits, so verify those in Apple's documentation before planning.

How to Reduce Mobile App Size Without Losing Functionality

How to Reduce Mobile App Size Without Losing Functionality

App size affects the decision to install, download time and how much storage a product takes on the device. It matters especially in markets with expensive mobile data and on phones with 32–64 GB of storage, where people regularly delete apps to make room for photos and system updates.

The good news is that most "extra" megabytes have nothing to do with functionality. They are forgotten resources, unoptimised images, duplicate libraries and code nobody calls. Below is how we at the studio approach size reduction: what to measure, where to look for weight, which tools give the biggest effect, and what you should not cut even for a nicer number.

Why size matters for the business

In 2017 the Google Play team published an analysis of its own data: for apps under 100 MB, every additional 6 MB of APK size correlated with roughly a 1% drop in install conversion. In emerging markets, removing 10 MB correlated with about a 2.5% increase in conversion. This is a correlation, not a controlled experiment, and some teams report a much smaller effect, but the direction is clear: a large package is friction at the door.

Size does not only affect the first install. Large updates are more often postponed when the phone is not on Wi-Fi, and a heavy app is the first candidate for deletion when the system warns about low storage. In our projects we treat size as part of the experience, alongside startup speed.

Where the extra weight comes from

  • unused resources and duplicate icons and illustrations in several densities;
  • large images and video without adaptive variants or modern formats;
  • third-party SDKs that add unused features;
  • debug code, logging and symbols in production builds;
  • dependencies that transitively pull in unnecessary modules;
  • bundled fonts with full glyph sets for languages the product does not support;
  • native libraries for every architecture in a single package.

Analyse first, optimise second

Start with a build analysis rather than assumptions. On Android that means APK Analyzer in Android Studio, the size report in Play Console and comparing two builds side by side. On iOS, use the App Thinning Size Report in Xcode and the per-device file size report in App Store Connect. Look at download size and install size separately: the compressed package and what occupies disk space can differ several times over.

Source of weightHow to find itWhat usually helps
Code (DEX, binary)APK Analyzer, Link Map in XcodeR8 with shrinking and optimisation, dead code removal, SDK audit
Raster imagesSort resources by sizeWebP or AVIF, vector graphics for icons, Asset Catalog
Unused resourcesLint, shrinkResourcesAutomatic removal at build time, cleaning up obsolete screens
Native librariesContents of the lib folderAndroid App Bundle, which delivers only the required architecture
Large contentVideo, models, dictionaries in the packagePlay Asset Delivery, On-Demand Resources or Background Assets on iOS

According to the WebP documentation, lossy compression produces files 25–34% smaller than comparable JPEGs, and lossless compression about 26% smaller than PNG. In illustration-heavy projects, images are often the fastest win.

A step-by-step size reduction plan

  1. Capture a baseline. Record download and install size for a typical device on each platform and keep the report in the repository.
  2. Find the ten largest components. A handful of items usually account for most of the weight, so start there.
  3. Turn on platform tooling. On Android, R8 with minifyEnabled and shrinkResources, and publishing as an App Bundle. On iOS, Asset Catalogs and no unnecessary architectures or symbols in the final binary.
  4. Review media. Convert raster assets to modern formats, replace simple icons with vectors and remove duplicates.
  5. Audit dependencies. For every SDK, check whether the whole module is used and whether a lighter alternative exists.
  6. Move rare scenarios out. Features used by a small share of the audience can be delivered as a separate module via Play Feature Delivery, or their content can be downloaded after installation.
  7. Add a budget to CI. A build that grows beyond an agreed threshold, for example 500 KB in a single pull request, should require explicit approval.

What not to cut

Do not remove analytics, security or error handling just to improve a number. Decide what must be available immediately and what can load later. Users care about a fast, useful start, not the smallest possible first package.

Be equally careful with aggressive obfuscation and removing code that is called via reflection: incorrect R8 rules produce crashes that only appear in release builds. That is why we verify every optimisation with tests and on real devices.

Note a newer Google requirement as well: Android vitals now tracks DEX code optimisation. Apps with more than 10 MB of DEX code are expected to apply optimisation, obfuscation and shrinking, and failing the thresholds may affect visibility on Google Play starting in February 2027.

Common mistakes

  • Optimising without measuring. The team spends a week rewriting a module and saves a few hundred kilobytes.
  • Comparing different metrics. APK size on a developer's disk is not what the user downloads through an App Bundle.
  • Moving everything to "download later". If a core feature needs an extra download after first launch, the user sees a spinner instead of value.
  • A smaller file but a slower start. If unpacking or initialisation became heavier, the overall experience got worse.
  • A one-off clean-up. Without a budget, size creeps back within a few releases.

Check results on real devices, especially budget ones; we wrote about this in detail in our article on testing on inexpensive phones. Our breakdown of Baseline Profiles in Android Calendar shows how code optimisation and startup are connected.

A one-sprint action plan

  • Produce download and install size reports for iOS and Android.
  • List the ten largest components and an owner for each.
  • Enable R8, shrinkResources and App Bundle publishing if they are not already on.
  • Convert the largest raster assets and remove duplicates.
  • Remove or replace SDKs that deliver no measurable value.
  • Add a size check to CI with a per-pull-request threshold.
  • After release, compare install conversion, first-launch time, crash rate and uninstalls.

Sources: Google Play: Shrinking APKs, growing installs; Android Developers: Reduce your app size; Android Developers: Android vitals; Google: WebP; Apple: Reducing your app’s size.

App Store in Taiwan: 26% Commission Instead of 30% and What to Check

App Store in Taiwan: 26% Commission Instead of 30% and What to Check

Apple has lowered the commission on the Taiwan storefront of the App Store from 30% to 26%. The change applies from 31 October 2026 to standard Apple In-App Purchase and paid app transactions on iOS and iPadOS. It follows discussions with Taiwan's Fair Trade Commission.

All facts come from the Apple Developer news post.

What exactly changed

  • 26% instead of 30% for standard IAP and paid apps on the Taiwan storefront.
  • The reduction applies from 31 October and does not require signing the updated terms by that date.
  • The Apple Developer Program License Agreement was revised to support updated policies. You can accept it in your account; translations will follow within a month.

The post does not break down other commission programs (for example subscriptions after the first year or small-business rates), so do not draw conclusions about them without checking Apple's documentation.

What your team should check

  • Unit economics for Taiwan. If you sell subscriptions or paid apps there, recalculate your margin at 26%.
  • Pricing. A 4-point difference can let you lower prices or keep them and earn more net revenue. That is a product decision, not an automatic consequence.
  • The agreement. Accept the updated license agreement in your account so later changes do not slip by.
  • Regional rules as a practice. App Store terms can differ by country, so build separate regional parameters into your pricing model.

Bottom line

The change itself is small, but it points to a trend: distribution terms depend more and more on region. Teams monetizing in Asia benefit from a flexible pricing model and from checking Apple Developer news regularly.

Android Developer Verification: Global Launch in January 2027 and a Checklist for Your Team

Android Developer Verification: Global Launch in January 2027 and a Checklist for Your Team

Google is preparing a global launch of Android developer verification. The protections have been live since 30 September 2026 in Brazil, Indonesia, Singapore and Thailand, and the global rollout begins in January 2027. Here is what changes and what your team should do now.

All facts come from the Android Developers Blog post.

What is happening

Verification was announced in 2025 as an extra security layer that makes it harder for bad actors to repeatedly spread harm. After more than a year of preparation with partners, protections went live for participating stores in four countries. The global rollout starts in January 2027 with seven distributors: Google Play, Galaxy Store, Honor, Oppo, Xiaomi, Transsion and Vivo. Over several months the protections will expand to all countries and all installation sources on certified Android devices.

Registration so far

According to Google, millions of apps have been registered since verification opened to everyone in March. They represent over 99% of all Android app installs globally, via any distribution channel.

What was added based on developer feedback

  • Limited distribution accounts for students and hobbyists: share apps without registration fees or a government ID check. The authorized-device limit grew from 20 to 50.
  • Android Developer ID Status API and Android Developer Console API: automate app registration from CI pipelines for teams with many apps.
  • An advanced flow for power users: install an unregistered app by knowingly accepting the risk, while guardrails against social-engineering scams stay in place for everyday users.

A checklist for your team

  • You publish on Google Play: check package registration status in Play Console and register any unregistered apps, including those you distribute outside Play.
  • You distribute only outside Google Play: create an Android Developer Console account, verify your identity and register your apps.
  • You publish on open-source registries: Google has a dedicated guide for registering existing and new apps.
  • You manage many apps: consider registering through the API from CI instead of by hand.

Google says registering an app takes under ten minutes. The risk of skipping it is that installing your app stops being seamless wherever the protections are live.

Bottom line

There is little time before January, and the work is simple: inventory packages, verify the account, register the apps. Teams that hand out builds outside Google Play (enterprise, regional and test channels) should be especially careful.

Google Play for Games: Foldable Screenshots from April 2027 and Tier 3 from August 2027

Google Play for Games: Foldable Screenshots from April 2027 and Tier 3 from August 2027

On 18 November 2026 Google Play announced new requirements for games on large screens and foldables. Two dates are already set: from April 2027 a game's listing must include foldable screenshots, and from August 2027 a game must meet the baseline Tier 3 of the large screen quality guidelines. Otherwise new games and updates cannot be published.

For game studios this means planning testing and art for several form factors well in advance. Below we go through what exactly Google requires, what Tier 3 covers and what to prepare now.

What Google announced

The Android Developers Blog post of 18 November 2026 describes two requirements:

  • Foldable screenshots (April 2027). New games and store listing updates need at least 3 foldable screenshots in addition to 1 standard phone screenshot, in the game's primary orientation. You can already upload them in Play Console (Grow → Store presence → Store listings).
  • Baseline Tier 3 "Ready" (August 2027). To publish new games and updates, a game must meet at least this level of the large screen and foldables guidelines.

The August milestone focuses on foldables first. Google says the requirements will later extend to tablets, Googlebook laptops and other large screens.

Which screenshots you need

The formats depend on the device type:

  • Standard phones: a screenshot in the game's primary orientation, 16:9 (landscape) or 9:16 (portrait).
  • Foldables with a 1:1 inner display (for example Samsung Galaxy Z Fold8 Ultra, Google Pixel 11 Pro Fold): at least one screenshot of the unfolded 1:1 inner screen. No separate outer screen screenshot is needed because its aspect ratio matches standard phones.
  • Foldables with a 4:3 inner display (for example Samsung Galaxy Z Fold8): at least one screenshot of the 4:3 (or 3:4) inner screen and one of the 16:10 (or 10:16) outer screen.

Screenshots from the Android Emulator's 1:1 and 4:3 foldable devices fully comply with the new Play Console requirements.

The three quality tiers

TierWhat is evaluatedStatus
Tier 3: ReadyFull-screen rendering in supported orientations, unobstructed HUD safe areas, clean in-engine letterbox/pillarbox in unsupported orientations, state and touch alignment preserved across folding, unfolding, rotation and multi-window resizingRequired from August 2027
Tier 2: OptimizedHigh-resolution graphics, proportional HUD scaling, styled framing when letterboxing, smooth frame pacing, full playability with external controllers, keyboards and miceBadging and enhanced merchandising
Tier 1: DifferentiatedSustained 60 FPS (120 FPS on supported displays), thermal and battery stability in long unfolded sessions, efficient modern graphics rendering, dynamic resolution scaling between inner and cover screensBadging and enhanced merchandising

Google notes that Tier 1 and Tier 2 unlock foldable badging on the Play Store, enhanced merchandising and a path to the Google Play Games Level Up program.

What to check in your game

  1. Configuration changes without losing progress. Folding and unfolding the device must not restart the session or reset level progress.
  2. HUD safe areas. UI elements must not be cut off or stretched on the unfolded screen.
  3. Unsupported orientation. If the game supports a single orientation, it should add bars cleanly inside the engine when rotated.
  4. Touch alignment. After the window is resized, touch points must match what the player sees.
  5. Multi-window. Check behavior in a resizable window.

Google points out that with modern engines much of the foundation is already in place: Unity and Unreal have dedicated guides for large screens and resizing.

Timeline

  • November 2026: you can upload foldable screenshots; they will appear in listings over the next few weeks.
  • April 2027: new games and updates must include foldable screenshots at submission.
  • August 2027: baseline Tier 3 is required to publish new games and updates.

You can test on physical devices, in Android Device Streaming, in engine simulators (Unity Device Simulator, Unreal viewport profiles) and in the Android Emulator for 1:1 and 4:3 form factors.

Conclusion

There is enough time to prepare, but game design and UI are the hardest things to change at the last minute. A practical order: capture foldable screenshots, run the game against the Tier 3 checklist on the 1:1 and 4:3 emulators, fix state loss and HUD issues, then look at Tier 2 for badging and merchandising.

Need a foldable audit for your game or help adapting the interface? Get in touch: we will look at your build and propose a plan.

App Store Tax and Price Updates: What Changes on 3 December 2026 and 1 January 2027

App Store Tax and Price Updates: What Changes on 3 December 2026 and 1 January 2027

On 17 November 2026 Apple announced tax and price changes for apps, in-app purchases and subscriptions. Some changes take effect on 3 December 2026, others on 1 January 2027. For teams with a paid app this is a chance to check the base storefront, tax categories and prices before the deadlines.

All facts below come from the Apple Developer news post.

New taxes

CountryWhat is introduced
Botswana14% VAT
Cameroon3% Significant Economic Presence (SEP) tax
Côte d'Ivoire3% SEP tax
Rwanda18% VAT

Exhibit B of the Paid Applications Agreement will be updated to say that Apple collects and remits the applicable taxes in Botswana and Rwanda. Translations will be available within one month. The post does not give an effective date for the changes in these four countries.

Price updates from 3 December 2026

Apple will update prices on these storefronts: Botswana, Colombia, Egypt, Rwanda and Türkiye. The updates also account for the new VAT. In practice:

  • If your app's base storefront is one of these five, prices there stay the same and other storefronts are re-equalized to your base price.
  • Auto-renewable subscriptions: prices do not change in any region.
  • Prices you manage manually are not affected on these storefronts.

California sales tax from 1 January 2027

From 1 January 2027 California sales and use tax applies to SaaS, App Store Software, Software Training Material, Dating and Boosting. Prices on the US storefront are displayed without tax, so your proceeds do not change, but the total customers pay may rise.

What developers should do

  1. Review upcoming price changes in App Store Connect under Pricing and Availability.
  2. Check your base storefront and change it if needed: it determines which prices are equalized.
  3. Review tax categories. If your app or purchases fall under SaaS, App Store Software, Software Training Material, Dating or Boosting, check the new SaaS attribute in Pricing and Availability.
  4. Adjust prices if you want. You can change prices for apps, IAPs and auto-renewable subscriptions at any time.

What it means for the product

For most teams this news does not require development work, but it does require attention to settings. Three questions are worth answering. First, is the base storefront chosen correctly, since prices in other countries depend on it. Second, does the product fall into the categories with the new California tax, and does anything need explaining to users at checkout. Third, do you manage prices manually or rely on Apple's equalization: 3 December works differently in each case.

If you sell subscriptions, it is also worth reviewing the plan structure and trial periods: pricing should be planned, not only revisited when Apple changes prices.

Conclusion

The dates are set: 3 December 2026 (price updates on five storefronts) and 1 January 2027 (California tax). One pass through the checklist in App Store Connect is enough to avoid surprises in prices or proceeds.

Need help with monetization, subscription pricing or preparing an app for the App Store? Get in touch: we will look at your model and propose a plan.

App Review Guidelines, October 2026: What Changed in 2.3.14, 2.5.19 and 1.2

App Review Guidelines, October 2026: What Changed in 2.3.14, 2.5.19 and 1.2

On 16 October 2026 Apple updated the App Review Guidelines. The changes do not look loud: one new rule about creative assets, a separate number for the rule on hidden features, and a few clarifications. But small wording like this is exactly what most often causes a rejection a team did not expect. Here is what changed and what to check in your app and on your App Store page.

What changed

According to Apple's description, the update covers the following items:

ItemWhat is newWho it affects
2.3.14 (new)A rule on creative assetsEveryone who designs an App Store page
2.5.19 (new)A ban on hidden, dormant or undocumented features; previously part of 2.3.1Everyone, especially teams that test features behind flags
1.2 (changed)Clarifies which app types and content the user-generated content rule coversApps with chats, comments, reviews, feeds
5 (changed)Apps that facilitate human trafficking or child exploitation are removed and blocked from alternative distributionPlatforms with UGC and communities
3.1.1(a)The Music Streaming Services Entitlements bullet is removed and merged into StoreKit External Purchase Link Entitlements; links may point to a permitted destinationApps with external purchase links

Apple also added links to additional documentation in "Before You Submit" and "After You Submit" and said translations will appear on its website within a month.

2.3.14: creative assets on your app page

The new rule did not appear by chance. On 5 October Apple introduced new creative assets: images and video in product page headers and in search results. Rule 2.3.14 sets the limits for them. According to Apple's text, creative assets:

  • must pertain to the app's content and functionality or its overarching brand;
  • must follow standard metadata guidelines;
  • must be appropriate for all audiences.

They must not include inappropriate content, references to other apps with an intent to mislead, unverifiable product claims, or specific or discounted pricing information. The last point matters for seasonal campaigns: a "50% off today only" banner will not pass as a creative asset. Announce discounts through other means, not in the page visuals.

2.5.19: hidden and undocumented features

This is not a new ban: it used to be part of 2.3.1 and now has its own number. The point is that an app must not contain "hidden, dormant, or undocumented features", and its behavior should be clear to both users and reviewers. Apple adds that trying to hide such features, including through code obfuscation, is grounds for removal of the app and termination of the developer account.

This is not a ban on obfuscation as such: it remains a normal way to protect code. The rule is about hiding what the app does. In practice, check:

  • Server-side flags (remote config). If a feature is switched on remotely after review, its existence should be described in the App Review notes;
  • Dormant features. Code for future capabilities sitting in the build should either be removed or documented;
  • Tester modes and hidden menus. Do not leave them in the production build without an explanation;
  • Workaround paths. Anything that changes behavior depending on the country or the reviewer's account is a risk.

In a separate announcement on 16 October Apple explains that 2.5.19 clarifies the long-standing ban on bait-and-switch: an app that misrepresents what it does during review and then adds features that were not in the submitted version after approval. Such apps can be removed from the App Store and the developer removed from the Apple Developer Program.

1.2: user-generated content

Rule 1.2 requires four things from apps that let users create, upload or share content:

  • a method for filtering objectionable material;
  • a mechanism to report offensive content, with timely responses;
  • the ability to block abusive users;
  • published contact information.

What is new in the clarification: failing to implement appropriate safeguards, or failing to remediate violations after notice, can be treated as a violation of the Developer Code of Conduct. So the risk is no longer limited to a rejected update; it also reaches the account. In its explanatory announcement Apple explicitly names nonconsensual intimate imagery, including imagery created with AI tools: apps with UGC must proactively prevent and remove it. If you have chats, comments, reviews or communities, check that all four mechanisms really work, not just on paper.

3.1.1(a): external purchase links

The change in 3.1.1(a) is technical: the Music Streaming Services Entitlements bullet is removed and merged into StoreKit External Purchase Link Entitlements. Developers can apply for an entitlement to include a link to a permitted destination for purchasing digital content. Outside specific regions and outside the US storefront, the rules say apps and their metadata may not include buttons, external links or other calls to action that direct customers to purchasing mechanisms other than in-app purchase. If you work with external payments, compare the current rule text with your storefront.

A checklist before your next release

AreaQuestionAction
Creative assetsDo banners show prices, discounts or comparisons with other apps?Remove prices and unverifiable claims
FeaturesDoes the build contain features the reviewer does not know about?Describe them in the review notes or remove them
Remote configDoes a flag change the essence of the app after review?Document every such flag
UGCDo filtering, reporting, blocking and contacts work?Test the flows manually and assign an owner for reports
External purchasesDoes the link text match the current version of 3.1.1(a)?Check against the rule for your storefront

The "Who it affects" column in the first table and this table reflect our practice and interpretation, not Apple's official position. For the full text see the App Review Guidelines.

Conclusion

The October update does not change the rules of the game, but it narrows the room for small violations: prices in creative assets, undocumented flags, weak moderation. These checks fit well into a pre-release checklist, and they cost less than a rejected update in peak season.

Want us to check your app before an App Store submission? Get in touch: we will run a compliance audit and help prepare the page and the reviewer notes.

iPhone Duo: How to Get Your App Ready for Apple's Foldable Before April 2027

iPhone Duo: How to Get Your App Ready for Apple's Foldable Before April 2027

On 23 October 2026 iPhone Duo went on sale: a foldable iPhone with two displays, an outer one when it is closed and an inner one that opens "like a book". For users it is a new form factor. For teams that maintain iOS apps it is a new deadline: from April 2027, every app and game submitted in App Store Connect must include iPhone Duo screenshots.

The good news is that you do not have to rewrite the app. But a few common code patterns break on this device, and it is better to find them now than a month before the deadline. Below we cover what Apple said, how an app behaves depending on the SDK, what to check in code, and what to prepare for your App Store page.

What Apple announced

According to Apple's announcement of 5 October 2026 and its iPhone Duo preparation guide:

  • iPhone Duo is available to customers from 23 October 2026;
  • you need to recompile the app with Xcode 27.1, which adds support for the new device; behavior in all poses and orientations can be checked in Device Hub;
  • iPhone Duo screenshots can be submitted now: your product page then shows a badge saying the app is optimized for iPhone Duo;
  • from April 2027 such screenshots become mandatory for every new submission.

Apple also suggests stating in the "Helpful Details" section of a featuring nomination that the app is optimized for iPhone Duo in all device poses.

How an app behaves depending on the SDK

How your app looks on the new device depends on the SDK it was built with. Apple describes three scenarios:

SDKOpen (inner display)Closed (outer display)
iOS 26 or earlierWindow centered at a familiar size with empty space around itContent sits to the left of the status bar and camera
iOS 27Fills most of the inner display, but still avoids the status bar on the rightApple does not specify
iOS 27.1 or laterEdge to edge; toolbars and tab bars move vertically below the status barEdge to edge, with a consistent experience across both displays

The practical takeaway: if you build with the new SDK, check how your UI handles vertical bars. This is where teams most often notice shifted elements and content that overlaps.

Step 1. Automated check

Apple suggests starting with a skill for a coding assistant: in Xcode you simply ask it to "get my app ready for iPhone Duo". For other agents the skill can be exported with xcrun agent skills export. Apple warns that it finds most issues but not all, so a manual review against the checklist below is still needed.

Step 2. Three patterns to find in your code

1. Screen size is taken from the main screen

If your code contains UIScreen.main, it is a candidate for a fix, because the window size no longer equals the device size and changes mid-session when the device is folded or unfolded:

  • replace UIScreen.main.bounds with view.bounds or window.bounds; in SwiftUI use GeometryReader or onGeometryChange;
  • move size-dependent calculations to layoutSubviews or viewDidLayoutSubviews; reading the size once at launch or in viewIsAppearing is not enough;
  • take scale from traitCollection.displayScale (UIKit) or @Environment(\.displayScale) (SwiftUI);
  • replace UIWindow(frame: UIScreen.main.bounds) with UIWindow(windowScene:), and do not store a screen: get it when needed through view.window?.windowScene?.screen.

2. Layout depends on orientation

Remove logic based on UIDevice.current.orientation, statusBarOrientation or interfaceOrientation. Compare the available width and height instead, through view.bounds, superview.bounds or the GeometryReader size.

3. Device type is guessed from idiom or size class

  • replace userInterfaceIdiom == .phone or .pad checks with size-class and available-space logic;
  • do not equate horizontalSizeClass == .regular with iPad: an iPhone can now have regular width too;
  • remove hardcoded checks such as bounds.height == 844;
  • for full-bleed media using .scaleAspectFill or .aspectRatio(contentMode: .fill), choose fill or fit based on the current size classes or aspect ratio, or set a focal point.

As a reference for the inner display, Apple suggests treating it as a natural extension of your iPad layout: the app should look as if it were designed for the larger screen.

Step 3. Test resizing

One run on a device is not enough. Apple suggests three ways to check:

  • The iOS resizable simulator in Device Hub for quick checks at arbitrary sizes;
  • iPhone Mirroring on macOS 27: resize the window to extreme sizes in both directions;
  • The iPhone Duo simulator in Xcode 27.1: the most accurate way to see the full native experience.

Also test scenarios where the size changes mid-task: filling in a form, video playback, an open keyboard, checkout. This is where state gets lost and layouts jump.

What to prepare for the App Store

From April 2027 a new version cannot be submitted without iPhone Duo screenshots. So it is worth preparing ahead:

  • capture screenshots in different orientations following Apple's specification;
  • check how your page looks in the App Store Connect preview tool, including the new creative assets;
  • mention in your featuring nomination that the app is optimized for iPhone Duo in all poses.

A checklist for the coming weeks

StepWhat to doOutcome
1Build with Xcode 27.1 and run in the iPhone Duo simulatorA list of screens with broken layout
2Find UIScreen.main, orientation checks and device idiom checksA list of places in code that depend on device size
3Fix the critical screens: onboarding, payment, the main flowAn app that does not break when folded or unfolded
4Test resizing during a sessionState is preserved and layout does not jump
5Prepare iPhone Duo screenshotsA ready set well before April 2027

This table reflects our practice, not Apple's official position. The order may differ per team depending on architecture: a SwiftUI project usually has fewer screen-size dependencies than a long-lived UIKit codebase.

Conclusion

iPhone Duo does not require a separate app, but it does require the app window to be genuinely flexible. A team that already supports iPad and multitasking will get through this quickly. A team that still relies on the main screen size and orientation should start with an audit now, while a few months remain before the screenshots become mandatory.

If you need help auditing an iOS app for adaptive layout or preparing for the new App Store requirements, get in touch: we will estimate the scope and propose a plan.

Journal

Ideas and products